NewsYourobserverJuly 3, 2026Sarasota County
1899 Fruitville Apartment Project Moves Forward in Sarasota
A proposed 324-unit apartment complex on Fruitville Road has received partial approval from the city's Development Review Committee. The project, which includes 36 affordable units, must still navigate potential traffic study requirements and requests for adjustments to building design standards.
Read the full story at YourobserverWhy It Matters
The project will replace existing small businesses and residences on a 3.44-acre site with a five-story, 324-unit apartment complex, potentially altering the density and traffic patterns of the downtown Sarasota area.
Key Facts
- The project proposes 324 residential units across 22 parcels on a 3.44-acre site.
- The development includes 36 affordable/attainable-priced units under the city's bonus density program.
- The building design features four stories along Fourth Street and five stories facing Fruitville Road.
- The project includes an internal parking structure with 439 spaces, which is 133 spaces above the city's minimum code requirement.
- The developer is seeking three administrative adjustments to reduce first- and second-floor habitable space requirements.
- The Fourth Street facade habitable space reduction request is 19.3% (from 341 feet, 9 inches to 277 feet, 6 inches).
- The Fruitville Road first-floor habitable space reduction request is 17.5% (from 499 feet, 11 inches to 492 feet, 3 inches).
- The Fruitville Road second-floor habitable space reduction request is 21.5%.
- Approximately 70 feet of Fourth Street frontage is designated for loading, waste pick-up, and service access rather than habitable space.
- The project received partial Development Review Committee sign-off on June 17.
- The project must return to the full committee if a pending traffic study triggers additional review from city departments.
- The site is currently zoned Downtown Edge and no rezoning is required for the project.
Who's Mentioned
personRebecca Webster“Former Certified Planner for the city who presided over the DRC meeting.”organizationBristol Development Group“The developer proposing the apartment project.”locationGillespie Park“The adjacent neighborhood district.”organizationPoole & Poole Architecture“The architecture firm providing renderings for the project.”personLucia Panica“Director of Development Services with authority to grant administrative adjustme”other1899 Fruitville“The name of the proposed apartment development project.”