OrganizationMARION COUNTY · LOCAL
Local Relevance
Tractor Supply
- Records
- 2
- Related bills
- 0
- Finance entries
- 0
- Connections
- 0
Save this entity to revisit their record, finance activity, and connections.
What This Entity Does
The available records identify this entity, but do not yet include a plain-English role description.
Recent Record
- Mon, Jul 61 item
- Mon, Jun 151 item
Not In The Record Yet
POLISCOPE has no related bills, finance activity or mapped connections for this entity in the records it has processed. That is a gap in coverage, not a finding about the entity.
Source Trail
Documents where this entity appears. Each item opens the Bill Dossier, which includes the official source URL when available.
- Jul 6, 2026local legislationTractor Supply - Major Site Plan 33238 - Waiver to Major Site Plan in Review Parcel #: 12438-002-01 # WaiverPIR-000981-2026 Dynamic Engineering LDC 6.12.12 - Sidewalks CODE states Sidewalks shall be provided in the Urban Area, Rural Activity Centers, and Specialized Commerce Districts along arterial, collector, and major local streets where these streets adjoin the project and minimally along one side of the internal streets. Sidewalks shall be constructed with all-weather surfaces and shall meet Americans with Disabilities Act, Florida Building Code, and FDOT Design Standards. APPLICANT - The client request a waiver to pay a fee in-lieu of sidewalk construction because there are no existing sidewalks in the vicinity of the site along N US Hwy 27 nor along W Hwy 326.
- Jun 15, 2026local legislationTractor Supply - Major Site Plan # 33488 - Waiver to Major Site Plan in Review Parcel #: 48405-001-00 #WaiverPIR-000873-2026 Cadjazz Engineering LDC 2.12.8 Current boundary and topographic survey CODE states Current boundary and topographic survey (one foot contour intervals extending 100 feet beyond the project boundary) based upon accepted vertical datum. Surveys will be less than 12 months old and accurately reflect current site conditions, meeting standards set forth in Ch. 5J-17, F.A.C. Alternate topographic data may be accepted if pre-approved by the Marion County Land Surveyor. APPLICANT - request to waive the Current Boundary and Topographic Survey. No current boundary and topo survey are required because the previous survey, along with the as-built survey from the self-storage facility that constructed the master drainage pond provides the required information. LDC 6.13.7.B(1) Geotechnical criteria CODE states Depth. Soil test borings shall be performed to a minimum depth of 10 feet below the proposed finished grade of the bottom of all retention/detention areas or the permanent pool elevation and once the data has been obtained the hole shall be backfilled and compacted. APPLICANT - request to waive soil test borings due to the fact that soil borings were completed for master pond by self-storage project. That data should be consistent with current design because there is no substantial change from initial permitted plans. LDC 6.12.12.A Sidewalks CODE states Sidewalks shall be provided in the Urban Area, Rural Activity Centers, and Specialized Commerce Districts along arterial, collector, and major local streets where these streets adjoin the project and minimally along one side of the internal streets. Sidewalks shall be constructed with all-weather surfaces and shall meet Americans with Disabilities Act, Florida Building Code, and FDOT Design Standards. APPLICANT requests to contribute to Marion County Sidewalk Fund in lieu of construction.